• SERVICES
  • PROJECTS
  • NEWS
  • ABOUT US
  • Contact
Menu

Speedpro

Street Address
City, State, Zip
Phone Number

Your Custom Text Here

Speedpro

  • SERVICES
  • PROJECTS
  • NEWS
  • ABOUT US
  • Contact

SKYE / OVERTON RD LEVEL CROSSING REMOVAL

Builder: John Holland

Client: LXRA

Works Completed:

- Form reinforce and pour abutments walls and slabs with very little working room due to live rail

- Form reinforce and pour over 2,000m3 of concrete for precast base slabs

- Installation of precast panels including a stitch pour to hold the precast

- Manufacture, supply and installation of 4 number 24 tonne precast approach slabs

With very limited room within the rail corridor due to live trains, Speedpro had to rely on innovatoin with forms, precast fixings and brackets, access/egress, along with earth retention. Together with our sister company Speedpro Engineering, we came up with the right solutions to get the job done.

SKYE / OVERTON RD LEVEL CROSSING REMOVAL

Builder: John Holland

Client: LXRA

Works Completed:

- Form reinforce and pour abutments walls and slabs with very little working room due to live rail

- Form reinforce and pour over 2,000m3 of concrete for precast base slabs

- Installation of precast panels including a stitch pour to hold the precast

- Manufacture, supply and installation of 4 number 24 tonne precast approach slabs

With very limited room within the rail corridor due to live trains, Speedpro had to rely on innovatoin with forms, precast fixings and brackets, access/egress, along with earth retention. Together with our sister company Speedpro Engineering, we came up with the right solutions to get the job done.

IMG_8301.JPG
IMG_8194.JPG
IMG_8192.JPG